Moving services

Office Movers — Back Up and Running by Monday

The measure of an office move is whether people can sit down and work the next morning. That means desks reassembled, monitors on them, and boxes at the right seat — not a floor of flat-packed furniture and a pile of unlabelled crates.

What is included

  • Workstation and desk disassembly and reassembly
  • Seat-level labelling so each person finds their own boxes
  • Filing, storage and cabinet contents kept in order
  • Monitors, screens and peripherals wrapped and transported safely
  • Furniture placed to your floor plan

What changes the price

Usually quoted per project from a desk count and a floor plan.

Estimate your move

The process

How office movers works

  1. Floor plan

    We work from your new floor plan. Every desk gets a number before anything is packed.

  2. Label

    Boxes and equipment labelled to desk number, not to room.

  3. Move

    Sequenced so critical functions are down for the shortest time.

  4. Set up

    Desks rebuilt, chairs placed, boxes at the right seat.

FAQ

Common questions

How far ahead should we plan an office move?

Four to eight weeks. The long poles are building approvals, dock bookings and insurance certificates at both ends, not the moving itself.

Do you provide crates?

Ask when you request the quote — crate supply depends on the size and length of the project.